There are five links for testing during production chain

1.Raw material inspection

1.Raw material inspection

High-quality aluminum rod which is under strict standard are extruded and drawn to different suitable dimension by dies machines.

 

2.Drawing inspection

The high quality and reliability of insulated conductors is dependent not only on the production process, but also on the choice of raw materials.

 

2.Drawing inspection
3.Semi-finished production inspection

3.Semi-finished production inspection

Before being coated, the conductor, copper or aluminium is reduced in dimension through drawing (round wire) or flattening (rectangular wire).

 

4.Finished product inspection

Assured quality of winding wire is first and foremost and cannot be compromised.HUILONG uses accepted IEC Standards as the minimum measure of quality.

4.Finished product inspection
5.Packing & Marking inspection

5.Packing & Marking inspection

Production is integrated with an audited Quality Control system supported by a trained technical team and fully equipped laboratory facilities.

6.Up to 13 test items

The most decisive way to test the magnet wire enamel is in its end use in a motor, transformer or coil. Our company has a complete packaging system, there are standard carton, pallet packaging, labels are divided into axle labels and box labels, can be traced back through axle labels, which day? Which stove? Which operator produces it? Which QC inspector inspects?


6.Up to 13 test items